Carodean Substation

Carodean Substation

Market: Energy Services: Biological Services Client: SCE County: San Bernardino Location: Twentynine Palms, CA UltraSystems completed pre-construction surveys for desert tortoise (Gopherus agassizii) and nesting birds, in accordance with the 2010 Desert Tortoise...
MWD Pipeline Rehabilitation

MWD Pipeline Rehabilitation

Market: Energy Services: Environmental Services Client: Black & Veatch County: Orange, Los Angeles Location: Various UltraSystems conducted an environmental review to identify significant hazardous material issues that could affect the construction, feasibility,...
Transmission Line Dismantling

Transmission Line Dismantling

Market: Energy Services: Construction Monitoring Client: SDG&E County: Imperial Location: El Centro, CA San Diego Gas and Electric (SDG&E) dismantled a 1.7-mile-long Imperial Solar Energy Center (ISEC) South East-West Transmission Line (E-W Line) on Bureau...
Imperial Solar Energy Center West

Imperial Solar Energy Center West

Market: Energy Services: Compliance Management Client: Tenaska County: Imperial Location: Imperial, CA Imperial Solar Energy Center (ISEC) West is a solar energy project that involved the construction of almost 1,130 acres of PV Solar arrays, and approximately...
Imperial Solar Energy Center South

Imperial Solar Energy Center South

Market: Energy Services: Compliance Management Client: Tenaska County: Imperial Location: Calexico, CA Imperial Solar Energy Center (ISEC) South is the construction of an up to 200 megawatt photovoltaic (PV) solar energy facility, a 1.7-mile long transmission line,...
Harper Lake Avian Surveys

Harper Lake Avian Surveys

Market: Energy, Biological and Cultural Resources Services: Biological Sampling and Surveys Client: Terra-Gen Power Holdings II, LLC Location: Harper Lake, CA Quarterly bird surveys at the Luz Solar Energy Generating Systems (SEGS) VIII and IX evaporation ponds are...
Mountain View Solar Energy Farm, Cultural Resources

Mountain View Solar Energy Farm, Cultural Resources

Category: Energy Client: AES Location: Palm Springs, CA UltraSystems prepared a cultural resource study for a proposed solar project located within the City of Palm Springs in Riverside County, California.  The ultimate goal of this study was to identify potential...
BP Crude Logistics Optimization Project, Environmental Impact Report

BP Crude Logistics Optimization Project, Environmental Impact Report

Category: Energy Client: City of Carson Location: Carson, CA UltraSystems, under contract to the City of Carson prepared an Environmental Impact Report (EIR) for BP West Coast Products, LLC.  Being proposed, was the construction and operation of two 260-foot diameter...