Projects

Murrieta Senior Living Facility

Murrieta Senior Living Facility

Slauson Avenue Bridge

Slauson Avenue Bridge

NAVFAC – Eight ICRMPS

NAVFAC – Eight ICRMPS

On-Call Nesting Bird Surveys

On-Call Nesting Bird Surveys

Elizabeth Lake Road Rehabilitation

Elizabeth Lake Road Rehabilitation

Elementary School in Planning Area 5B

Elementary School in Planning Area 5B

Naval Air Facility – El Centro

Naval Air Facility – El Centro

Naval Air Weapons Station – China Lake

Naval Air Weapons Station – China Lake

East Avenue O Bike Path

East Avenue O Bike Path

Fairfield Ranch Commons Mixed-Use

Fairfield Ranch Commons Mixed-Use

San Timoteo Storm Drain

San Timoteo Storm Drain

Los Alamitos Bus Facility

Los Alamitos Bus Facility

Los Angeles River Regional Bike Bath

Los Angeles River Regional Bike Bath

Carodean Substation

Carodean Substation

MWD Pipeline Rehabilitation

MWD Pipeline Rehabilitation

Santa Ana River Mainstem Flood Control

Santa Ana River Mainstem Flood Control

La Quinta Single-Family Detached Homes

La Quinta Single-Family Detached Homes

Portola Springs Elementary School

Portola Springs Elementary School

Transmission Line Dismantling

Transmission Line Dismantling

Stoneview Nature Center

Stoneview Nature Center

Imperial Solar Energy Center West

Imperial Solar Energy Center West

Avenida Columbo Storm Drain Extension

Avenida Columbo Storm Drain Extension

Uptown Orange Mixed-Use

Uptown Orange Mixed-Use

Roadside Drive Bridge Widening

Roadside Drive Bridge Widening

LA-RICS – 232 sites

LA-RICS – 232 sites

San Fernando High School Teen Center

San Fernando High School Teen Center

Orangethorpe Grade Separation

Orangethorpe Grade Separation

JAG Projects

JAG Projects

Glendale-Hyperion Viaduct Complex

Glendale-Hyperion Viaduct Complex

Imperial Solar Energy Center South

Imperial Solar Energy Center South

Inglewood Avenue Corridor Widening

Inglewood Avenue Corridor Widening

Doheny Hotel Development

Doheny Hotel Development

Sunshine Canyon Landfill Mitigation Monitoring

Sunshine Canyon Landfill Mitigation Monitoring

Tarplant Mitigation and Restoration

Tarplant Mitigation and Restoration

Cameron Ranch Residential Development

Cameron Ranch Residential Development

Alton Parkway Extension

Alton Parkway Extension

San Clemente Target Store EIR

San Clemente Target Store EIR

Platinum Triangle –  CEQA Compliance for new Elementary School

Platinum Triangle – CEQA Compliance for new Elementary School

Owens Lake Dust Mitigation Project – Phase 7

Owens Lake Dust Mitigation Project – Phase 7

Heacock Street Bridge Replacement

Heacock Street Bridge Replacement

Hotel Angeleno Noise Measurements

Hotel Angeleno Noise Measurements

Harper Lake Avian Surveys

Harper Lake Avian Surveys

Pine Canyon Road Reconstruction

Pine Canyon Road Reconstruction

Century High School

Century High School

Los Angeles County Conversion Technologies, Phase II

Los Angeles County Conversion Technologies, Phase II

Conversion Technology Study and Report for Orange County Waste & Recycling

Conversion Technology Study and Report for Orange County Waste & Recycling

Permitting Pathways Analysis for a Commercial Conversion Technology Project

Permitting Pathways Analysis for a Commercial Conversion Technology Project

Inland Regional Materials Recovery Facility, Mitigated Negative Declaration

Inland Regional Materials Recovery Facility, Mitigated Negative Declaration

Livestock Grazing on Three BLM Allotments – No. 4108, No. 4141, and No. 4199, Environmental Assessments

Livestock Grazing on Three BLM Allotments – No. 4108, No. 4141, and No. 4199, Environmental Assessments

Master Environmental Services Contract, County of Orange, OC Public Works

Master Environmental Services Contract, County of Orange, OC Public Works

Los Angeles County Department of Public Works (2008-2010), Bird & Bat Exclusion Monitoring at Bridges

Los Angeles County Department of Public Works (2008-2010), Bird & Bat Exclusion Monitoring at Bridges

University Business Park and Mixed-Use Development/Specific Plan EIR

University Business Park and Mixed-Use Development/Specific Plan EIR

Beech Street Development Project

Beech Street Development Project

San Emidio Specific Plan, Environmental Impact Report

San Emidio Specific Plan, Environmental Impact Report

Redlands Commons, Environmental Impact Report

Redlands Commons, Environmental Impact Report

Miramar Plaza, Mixed-Use Development, Environmental Impact Report

Miramar Plaza, Mixed-Use Development, Environmental Impact Report

Emerald Meadows Ranch Specific Plan Feasibility Analysis and Environmental Impact Report

Emerald Meadows Ranch Specific Plan Feasibility Analysis and Environmental Impact Report

William A. Fox Airport Master Plan Update

William A. Fox Airport Master Plan Update

John Wayne Airport, Fire Station No. 33, Noise Study

John Wayne Airport, Fire Station No. 33, Noise Study

Port of Los Angeles/Port of Long Beach On-Call Environmental Services

Port of Los Angeles/Port of Long Beach On-Call Environmental Services

Marriott Residence Inn, Mitigated Negative Declaration

Marriott Residence Inn, Mitigated Negative Declaration

GATX Lease Renewal Addendum

GATX Lease Renewal Addendum

Ambient Air Monitoring at the Naval/Marine Reserve Center

Ambient Air Monitoring at the Naval/Marine Reserve Center

Berths 48–52 Improvement Project Air Quality and Traffic Studies

Berths 48–52 Improvement Project Air Quality and Traffic Studies

Water Quality Monitoring of Dredging Activities

Water Quality Monitoring of Dredging Activities

Tugboat Air Emissions Study

Tugboat Air Emissions Study

Vesta Telecommunication Fiber Optics Mitigated Negative Declaration (MND)

Vesta Telecommunication Fiber Optics Mitigated Negative Declaration (MND)

Altrio Communications, Inc.

Altrio Communications, Inc.

Whiteman Airport Master Plan Update

Whiteman Airport Master Plan Update

Mountain View Solar Energy Farm, Cultural Resources

Mountain View Solar Energy Farm, Cultural Resources

SEGS VIII and IX Annual Aquatic Invertebrate Pond Sampling and Quarterly Avian Monitoring

SEGS VIII and IX Annual Aquatic Invertebrate Pond Sampling and Quarterly Avian Monitoring

BP Crude Logistics Optimization Project, Environmental Impact Report

BP Crude Logistics Optimization Project, Environmental Impact Report

Tehachapi Transmission Line Project Proponents Biological Resource Survey

Tehachapi Transmission Line Project Proponents Biological Resource Survey

Biological Monitoring Services for the Sunrise Powerlink Project

Biological Monitoring Services for the Sunrise Powerlink Project

Superstition Substation to Bullfrog Dairy Electrical Distribution Line Environmental Assessment (EA)

Superstition Substation to Bullfrog Dairy Electrical Distribution Line Environmental Assessment (EA)

Environmental Services, Lompoc Wind Energy Project

Environmental Services, Lompoc Wind Energy Project

Marvin Braude Mulholland Gateway Park, Environmental Impact Report

Marvin Braude Mulholland Gateway Park, Environmental Impact Report

Citrus Heights North Specific Plan, Environmental Impact Report (EIR)

Citrus Heights North Specific Plan, Environmental Impact Report (EIR)

Kern County/Los Angeles County Boundary Change, Negative Declaration

Kern County/Los Angeles County Boundary Change, Negative Declaration

“I will personally make sure that the hard work and effort that UltraSystems has shown with the expedited San Diego Creek request is reflected in the scoring/evaluation, and that UltraSystems will definitely move up in the ranking.”

– Vinh Tran, P.E., Civil Engineer
Project Management, RDMD
County of Orange

“Betsy, indeed it was a pleasure working with you and the staff of UltraSystems over the last three years.  You folks did a very good job for us under the ENO70 contract.  You were always very responsive, technically proficient and reasonable in costs.  You have played a major role in facilitating Metro's construction program.  I will look forward to the opportunity to work with you again in the future.”

– Carl Peter Ripaldi
Principal Environmental Specialist
Metropolitan Transportation Authority

“I really appreciate the hard work and the quality of work that you and your staff at UltraSystems do.  Over the past few years, I have been very impressed with UltraSystems' work ethics, comprehensiveness, thoroughness of documents, and responsiveness to clients' and communities' needs.”

– Dr. Robert Manford, Ph. D, REA
Senior Planner, Environmental Review Unit
Community Redevelopment Agency of the City of Los Angeles

“Throughout the years and the numerous projects that you and your staff have worked on for our Department, it has always been a great working relationship.  I genuinely respect your technical knowledge and professionalism in the outstanding work that was provided.  I look forward to continued success in working together on future projects.”

– Sarah D. Scott
Programs Development Division
Los Angeles County Department of Public Works

“This message is to convey my sincere gratitude to UltraSystems during the processing of the additional CEQA environmental documentation for the Sunshine Canyon Landfill in Los Angeles County.  You and your staff were always professional, knowledgeable, and timely in the assistance you brought to the preparation of a circulated Addendum to both the City of Los Angeles and the County for previous EIRs on the landfill, a very controversial project.”

– Daryl Koutnik
Managing Principal, Biological Sciences, Supervising Regional Planning
LA County Department of Regional Planning

“With the large-scale project and the monitoring effort necessary to comply with state and local requirements as well as standard construction monitoring issues, UltraSystems was able to react quickly to the project’s needs with augmented staff as necessary.”

– Gary Sycalik
Resident Engineer, Owens Lake Dust Mitigation Project Phase 7
KDG Development & Construction Consulting

“Once provided with the Notice to Proceed, UltraSystems performed their environmental services with minimal technical direction.  All work was performed as required in a method that promoted accuracy, responsiveness, cost-effectiveness, and timely Caltrans approval for projects with Federal Funding.”

– Bill Zimmerman, P.E., T.E., PTOE
President
W.G. Zimmerman Engineering

“Not only has the performance of work been outstanding, I personally have found the staff with UltraSystems to be very pleasant and easy to work with.  I would highly recommend the services of UltraSystems to other agencies.”

– Cary Brockman
Director, Facilities Planning
Capistrano USD

Project: Narco Channel Report, “I find the report exciting, fascinating and awesome.”

– Rory Paster
Permit Manager, Regulatory Permits Section
OC Public Works

“I want to take my hat off to you and your team.  Completing these reports and submitting them on time is a huge milestone for our entire Anaheim to Los Angeles team!”

 David M. Thomson, PE
Vice President
STV Incorporated

“It was a pleasure working with UltraSystems on the Arlington Heights Sports Park environmental process.  Your professionalism, responsiveness and technical proficiency was a great asset in helping the City of Riverside complete the initial study, MND, and other CEQA documentation.  We look forward to working with you in the future.”

– Randy McDaniel
Project Manager, Parks, Recreation, and Community Services Department
City of Riverside

“UltraSystems participated in a flawless job in preparing an impenetrable (by legal action) CEQA document for the Sunshine Canyon Landfill project in the County of Los Angeles.”

– Daryl Koutnik
Supervising Regional Planning, Impact Analysis Section
Los Angeles County Department of Regional Planning

“You did an excellent job protecting the public's interest and University's concern with costs.”

– Steinar Sire
University of California, Irvine

“UltraSystems has consistently performed at a very high level, producing work of the highest caliber.  We have found them to approach their work with a positive “can-do” attitude.  For the AMLI Uptown Orange project, UltraSystems prepared a thorough MND under extreme time pressures without sacrificing quality or detail.”

– Mark Hickner, AICP
Planning and Entitlement Director
KTGY Group, Inc.

“Thank you for putting together the “Jurisdictional Waters and Upland Habitats Impact Table” for the Huntington Bridges Preventive Maintenance Project.  I thought it was very well thought out and very easy to understand – even for an engineer!  Thank you for your perseverance on this project.”

– Jonathan Claudio
Project Engineer
City of Huntington Beach

“Your staff was diligent and consciences in completing the scope of work on time and within budget.  The IUSD thanks UltraSystems for your effort and professionalism.”

– Ana Gonzalez
Supervisor, Facilities Planning
Irvine USD

“The work UltraSystems provided was delivered and completed in a professional manner, on time and within budget.  Their efforts and service were greatly appreciated, and the District would be most receptive to future opportunities to do business with them again.”

– Keith Matsuo
Director, Facilities & Construction
Alhambra USD

“To date, we have retained UltraSystems as an environmental consultant on high profile projects, and will continue to do so as we are confident in their technical abilities and knowledge.”

– Cary Brockman
Director, Facilities Planning
Capistrano USD

“The rigorous environmental and regulatory planning and permitting procedure is much more manageable with UltraSystems’ participation and guidance.”

– Rory Paster
Environmental Engineering Specialist, Projects & Regulatory Permits Unit
OC Public Works

“UltraSystems played a crucial role in obtaining a conditional use permit…in a timely, cost effective and professional manner.”

– Michael Francis
Attorney at Law
Demetriou, Del Guercio, Springer & Francis, LLP

“UltraSystems’ staff is professional, provides reports in a timely manner, and is responsive to any inquires or requests from City and County staff.”

– Maria Masis, AICP
Supervising Planner
LA County Regional Planning

“The City of Dana Point has enjoyed a positive working relationship with UltraSystems over the last several years.  UltraSystems demonstrated both professionalism and responsiveness to City staff throughout the duration of the project.  Ultimately, a very comprehensive and defensible EIR was produced, which was well received within the community.”

– Erica Demkowicz, AICP
Senior Planner
City of Dana Point

“Caltrans District 12 environmental reviewer seemed favorably impressed with your work, and specifically asked me for the name of the consultant who prepared the PES.  So yes, I think we would very much like to work with your organization again.”

– Sean Nazarie, P.E.
Director of Engineering
CNC Engineering

“For each of these tasks, your staff was responsive to our needs, and completed quality work in an efficient and professional manner.  The dedication and work effort to accommodate the District schedules and deadlines are much appreciated.  Each task was completed with the approved budgets.”

– John Eclevia
Director, FMOT
Los Alamitos USD

“Professional service to address immediate needs onsite.  Excellent services; would use again in the future.”

– Steven Ross
Project Manager
Everstrong Construction

“I have always been very happy with the services by UltraSystems to our Planning Group here at Willdan.  We will certainly keep you at the top of the list of biological resources subconsultants (although we know you have service capabilities in many additional areas).”

– Dean Sherer, AICP, ENV SP
Director of Planning
Willdan Engineering

“Contractor attentive to on-the-ground requirements, committed to avoiding concerns related to habitat sensitivity, application of pesticides, etc.  Public outreach component was well executed and helped to avoid potential issues.”

– Daniel Sulzer
Assistant Chief, Planning Division
CPARS–USACE